When Should You Move from Iterations to Flow?

I’m writing part of the program management book, talking about how you need to keep everything small to maintain momentum. Sometimes, to keep your work small, teams move from iterations to flow.

Here are times when you might consider moving from iteration to flow:
 
 
 
 
 
 

  • The Product Owner wants to change the order of features in the iteration for business reasons, and you are already working in one- or two-week iterations. Yes, you have that much change.
  • You feel as if you have a death march agile project. You lurch from one iteration to the next, always cramming too much into an iteration. You could use more teams working on your backlog.
  • You are working on too many projects in one iteration. No one is managing the project portfolio.

This came home to me when I was coaching a program manager working on a geographically distributed program in 2009. One of the feature teams was responsible for the database that “fed” all the other feature teams. They had their own features, but the access and what the database could do was centralized in one database team. That team tried to work in iterations. They had small, one- or two-day stories. They did a great job meeting their iteration commitments. And, they always felt as if they were behind.

Why? Because they had requests backed up. The rank of the requests into that team changed faster than the iteration duration.

When they changed to flow, they were able to respond to requests for the different reports, access, whatever the database needed to do much faster. They were no longer a bottleneck on the program. Of course, they used continuous integration for each feature. Every day, or every other day, they updated the access into the database, or what the database was capable of doing.

The entire program regained momentum.

kanban.iteration
This is a simplified board. I’m sure your board will look different.

When you work in flow, you have a board with a fixed set of Ready items (the team’s backlog), and the team always works on the top-ranked item first. Depending on the work in progress limits, the team might take more than one item off the Ready column at a time.

The Product Owner has the capability to change any of the items in the Ready column at any time. If the item is large, the team will spend more time working on that item. It is in the Product Owner’s and the team’s interest to learn how to make small stories. That way, work moves across the board fast.

If you use a board something like this, combined with an agile roadmap, the team still has the big picture of what the product looks like. Many of us like to know what the big picture is. And, we see from the board, what we are working on in the small. However, we don’t need to do iteration planning. We take the next item off the top of the Ready list.

There is no One Right Answer as to whether you should move from iteration to flow. It depends on your circumstances. Your Product Owner needs to write stories that are small enough that the team can complete them and move on to another story. Agile is about the ability to change, right? If the team is stuck on a too-large story, it’s just as bad as being stuck in an iteration, waiting for the iteration to end.

However, if you discover, especially if you are a feature team working in a program, that you need to change what you do, or the order of what you do more often than your iterations allow, consider moving to flow. You may decide that iterations are too confining for what you need.

Johanna Rothman

Johanna consults, speaks, and writes about managing product development. She helps managers and leaders do reasonable things that work. You can read more of her writings at jrothman.com.
Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Back to top button